Certificate of Fitness & PMA in Johor Bahru

DOSH machinery registration and renewal for boilers, pressure vessels and lifting equipment — documentation prepared, submission guided, inspection managed.

Overview

The rules changed in June 2024

The Factories and Machinery Act 1967 was repealed on 1 June 2024. Machinery certification now sits under OSHA 1994 and the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024 — P.U.(A) 99/2024. A great deal of the guidance still circulating online, including material from suppliers and contractors, cites the repealed Act and its forms.

The substance has not changed as much as the framework: steam boilers, unfired pressure vessels and lifting machinery still require a valid Certificate of Fitness before they are operated. But the instrument, the schedules and the process references are different, and submissions prepared against the old framework are a common cause of delay.

We handle machinery registration and renewal for manufacturers and industrial operations across Johor Bahru, Pasir Gudang, Tebrau, Senai, Kulai and Iskandar Puteri.

New Plant Registration

Design verification documents, manufacturer certification and the full submission package for plant not yet registered.

CF Renewal

Preparation ahead of expiry so the inspection is scheduled around your shutdown rather than against it.

Scope Review

Which of your equipment actually falls inside the regime — and which does not. Both answers save money.

Renewal Tracking

One register of every certificated item and its expiry date, so nothing lapses unnoticed.

Scope

What needs a Certificate of Fitness

Steam boilers

Any closed vessel generating steam above atmospheric pressure, including economisers, superheaters and connected pipework and fittings.

Unfired pressure vessels

Air receivers, storage vessels and process vessels holding gas or liquid under pressure. Smaller vessels may be exempt — the thresholds are specific and worth checking.

Lifting machinery

Tower cranes, mobile cranes, overhead cranes, hoists, gondolas, passenger lifts, escalators, walkalators, suspended access equipment and quay cranes.

Design verification first

Approval of the design must be obtained before installation. Plant installed ahead of that approval creates a problem that is expensive to unwind.

Marking and records

The registration number must be displayed prominently on the plant, and maintenance records kept covering the condition of safety devices and any damage.

Forklifts sit outside it

Forklifts are not within the Certificate of Fitness regime — but every OSHA 1994 duty still applies. We wrote about why this is widely misunderstood.

Who Needs This Service

Is this you?

  • You are installing new plantand need design verification and registration before it can legally operate.
  • You have several certificated itemson different fifteen-month cycles and no single view of when each expires.
  • A certificate has already lapsedand the equipment is either shut down or running when it should not be.
  • You are unsure what is even in scope— particularly air receivers, where assumptions about exemption are often wrong.
  • You have taken over a siteand inherited plant with incomplete or missing certification history.
  • A previous submission was rejected or delayedand nobody is sure which part of the package caused it.
How We Help

Your account, our legwork

The myKKP account belongs to you, and submissions are made from it. That is how it should be — you keep control of your own compliance record. What we do is prepare the documentation package, walk you through the submission itself, and manage everything around it.

We do not inspect and we do not issue the certificate. Inspection is carried out by a DOSH officer or a licensed inspector, and DOSH issues the Certificate of Fitness. Our job is making sure that when the inspection happens, it passes — and that it is scheduled around your production rather than in the middle of it.

Most delays we see are avoidable: incomplete manufacturer documentation, missing calibration certificates for gauges and safety valves, or a package prepared against the repealed Factories and Machinery framework rather than the current regulations.

Our Process

How registration runs

Scope & Inventory

We walk your plant and establish what is in scope, what is already certificated, and when each certificate expires — reading the dates off the certificates themselves.

Document Preparation

Design verification documents, manufacturer certification, calibration certificates for gauges and safety devices, and the technical compliance package assembled and checked.

Submission Support

We guide you through submitting from your own myKKP account, so the package goes in complete and correctly the first time.

Inspection & Renewal Tracking

Inspection coordinated around your shutdown planning, then every expiry date tracked so the next renewal starts early rather than late.

FAQ

Certificate of Fitness — common questions

What is a PMA, and is it the same as a Certificate of Fitness?

PMA stands for Perakuan Memperbolehkan Alat, and PMT for Perakuan Mesin Tekanan. Both are legacy terms from the Factories and Machinery Act 1967 era. Since 1 June 2024 the governing instrument is P.U.(A) 99/2024 and the document is the Certificate of Fitness. The old terms are still used everywhere — by suppliers, contractors and often on site — and they refer to the same obligation.

What machinery requires a Certificate of Fitness?

Three categories: steam boilers, unfired pressure vessels, and lifting machinery — tower cranes, mobile cranes, overhead cranes, hoists, gondolas, passenger lifts, escalators and suspended access equipment among them. Forklifts sit outside the Certificate of Fitness regime, though every employer duty under OSHA 1994 still applies to them.

How long is a Certificate of Fitness valid?

Fifteen months, and the expiry date is printed on the certificate itself, so there is nothing to calculate. The difficulty is not knowing one date — it is that a site with several certificated items has several dates on independent fifteen-month cycles, drifting further out of step with the calendar year each renewal.

Does ProSafe inspect the machinery or issue the certificate?

No. Inspection is carried out by a DOSH officer or a licensed inspector, and the certificate is issued by DOSH. We prepare the documentation, guide the submission and manage the process around it. That separation matters, and any consultant telling you otherwise is describing something they cannot do.

Whose myKKP account is used?

Yours. The account belongs to the end user and submissions are made from it, so we prepare the package and walk you through submitting rather than submitting on your behalf. Your compliance record stays in your hands, which is where it belongs.

Is my air receiver or small pressure vessel exempt?

Some smaller unfired pressure vessels fall outside the requirement, but the thresholds are specific and a standard workshop air receiver often falls inside it despite people assuming otherwise. Send us the nameplate details and design pressure and we will confirm against the current schedules — it is a quick answer and worth having before you assume either way.

Coverage

Where we work

We register and renew plant across Johor Bahru, Pasir Gudang, Tebrau, Plentong, Masai, Skudai, Senai, Kulai, Iskandar Puteri and Gelang Patah. Scope reviews are done on site — nameplates, installation and safety devices need to be seen rather than described.

Not sure what needs certifying?

Send us a list of your boilers, vessels and lifting equipment. We will tell you what is in scope, what is not, and when each certificate expires.